Kavach 4.0 Successfully Commissioned on 2,633 Route Kilometres Covering 1,423 Rkm on Delhi-Mumbai and 1,210 Rkm on Delhi-Howrah Routes
₹3,875 Crore Utilised on Kavach Works up to June 2026 for Railway Safety
Railways Undertakes Major Capacity Enhancement with 514 Infrastructure Projects Covering 40,000 Km Sanctioned at a Cost of Around ₹8.31 Lakh Crore
Around 6 Lakh Railway Employees Trained Annually Through Centralized Training Institutes and Gati Shakti Vishwavidyalaya for Continuous Capacity Building and Enhanced Professional Competencies
Posted On: 05 AUG 2026 3:25PM by PIB Delhi
Out of total Budget grant of Rs.2,93,030 Cr. in 2026-27, till July’26, expenditure of Rs. 1,14,973 Cr. has been incurred i.e. about 39%.
Safety is accorded the highest priority on Indian Railways. As a consequence of various safety measures taken over the years, there has been a steep decline in the number of accidents.
On Indian Railways, the expenditure on Safety related activities has increased over the years as under:-
Year
Expenditure/Budget on Safety related activities (Rs. in Cr.)
2013-14
39,200
2022-23
87,336
2023-24
1,01,662
2024-25
1,14,022
2025-26
1,17,693
2026-27
1,20,389
Implementation of Kavach
- Kavach is an indigenously developed Automatic Train Protection (ATP) system. Kavach is a highly technology intensive system, which requires safety certification of highest order (SIL-4).
- Kavach aids the Loco Pilot in running of trains within specified speed limits by automatic application of brakes in case Loco Pilot fails to do so and also helps the trains to run safely during inclement weather.
- The first field trials on the passenger trains were started in February 2016. Based on the experience gained and Independent Safety Assessment of the system by Independent Safety Assessor (ISA), three firms were approved in 2018-19, for supply of Kavach Ver 3.2.
- Kavach was adopted as National ATP system in July, 2020.
- Implementation of Kavach System involves following Key Activities:
Installation of Station Kavach at each and every station, block section.
Installation of RFID Tags throughout the track length.
Installation of telecom Towers throughout the section.
Laying of Optical Fibre Cable along the track.
Provision of Loco Kavach on each and every Locomotive running on Indian Railways.
- Based on deployment of Kavach version 3.2 on 1,465 RKm on South Central Railway and experience gained, further improvements were made. Finally, Kavach specification version 4.0 was approved by RDSO on 16.07.2024.
- Kavach version 4.0 covers all the major features required for the diverse railway network. This is a significant milestone in safety for Indian Railways. Within a short period, IR has developed, tested and started deploying Automatic Train Protection System.
- Major improvement in Version 4.0 includes increased Location Accuracy, Improved Information of Signal Aspects in bigger yards, Station to Station Kavach interface on OFC and Direct Interface to existing Electronic Interlocking System. With these improvements, Kavach Ver.4.0. is planned for large scale deployment over Indian Railways.
- After extensive and elaborate trials, Kavach Version 4.0 has been successfully commissioned on 2,633 Route Kilometres as on 31.07.26, covering the high density Delhi- Mumbai and Delhi-Howrah routes as below:
SN
Section
Progress (Route Km)
(1)
Delhi-Mumbai route: 1,423 Rkm
i
Tilak Bridge – Junction cabin – Palwal – Mathura –Kota
-Nagda-Ratlam–Vadodara-Virar section
1,327
ii
Vadodara – Ahmedabad section
96
(2)
Delhi – Howrah route: 1,210 Rkm
i.
Chipyana – Tundla – Kanpur – Subedarganj section
563
ii.
Kanpur –…