प्रविष्टि तिथि: 18 DEC 2025 2:48PM by PIB Delhi
Upgradation and improvement of railway tracks on Indian Railways to increase the speed potential have been carried out in a big way during the last 11 years. The measures for track upgradation include use of 60 kg rails, wider base concrete sleepers, thick web switches, longer rail panels, H Beam sleepers, modern track renewal and maintenance machines, interlocking of level crossing gates, intense monitoring of track geometry etc.
As a result of the above measures, there has been significant increase in speed potential of the tracks. Total percentage of track having speed potential of 110 kmph and above has gone to 79% in Nov’25 from 40% in Mar’14. The details of speed potential of railway tracks during 2014 vis-a-vis 2025 are as under:
Sectional Speed (kmph)
2014
2025
Track km
%
Track km
%
<110
47897
60.4
21936
20.7
110-130
26409
33.3
60726
57.5
130 & above
5036
6.3
23010
21.8
Total
79342
100
105672
100
This information was provided by the Union Minister for Railways, Information & Broadcasting and Electronics & Information Technology, Shri Ashwini Vaishnaw, in a written reply to a question in Lok Sabha.

