{"id":1849,"date":"2025-09-30T16:11:00","date_gmt":"2025-09-30T16:11:00","guid":{"rendered":"https:\/\/pramad.in\/?p=1849"},"modified":"2025-09-30T16:11:01","modified_gmt":"2025-09-30T16:11:01","slug":"soon-work-will-start-on-bihta-anugrah-narayan-road-new-lineincluding-bihta-ror-117-km-3606-cr","status":"publish","type":"post","link":"https:\/\/pramad.in\/?p=1849","title":{"rendered":"Soon Work will start on Bihta &#8211; Anugrah Narayan Road new lineincluding Bihta ROR (117 Km; 3,606 Cr)"},"content":{"rendered":"\n<p>\u25cf New railway line project from Bihta to Anugrah Narayan Road (117 Km) including Bihta ROR has been sanctioned.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full is-resized\"><img decoding=\"async\" src=\"https:\/\/pramad.in\/wp-content\/uploads\/2025\/09\/WhatsApp-Image-2025-09-30-at-21.25.32-1.jpeg\" alt=\"\" class=\"wp-image-1851\" style=\"width:324px;height:auto\"\/><\/figure>\n\n\n\n<p><br>\u25cf The estimated completion cost of this project is 3,606 Cr.<br>\u25cf This rail line will provide direct connectivity between Bihta &#8211; Anugrah Narayan road, and will reduce travel time between Patna and Son Nagar.<br>\u25cf Bihar Budget allocation (Rs Cr)<br>#<br>Budget<br>2009-14<br>2025-26<br>1<br>Annual Average<br>1,132<br>10,066 (9x)<br>\u25cf Works completed in Bihar (since 2014)<br>\u25cb Constructed 1,899 Km of new tracks (more than entire rail network of Sri Lanka)<br>\u25cb Electrified 3,039 Km; Bihar is 100% electrified<br>\u25cb 559 rail flyovers &amp; under-bridges constructed<br>\u25cb Passenger amenities: Lifts 84, Escalators 51, Wifi at 393 stations<br>\u25cf Now, Total works worth 1,11,340 Cr under progress in Bihar, including:<br>\u25cb Railway track creation projects: 57 new rail projects; 5,171 Km; 98,016 Cr (This includes 6 projects sanctioned by Cabinet in PM Modi ji\u2019s 3rd term: 673 Km; 13,432 Cr)<br>\u25cb 98 Amrit stations of 3,285 Cr (2 inaugurated by Hon\u2019ble PM on 22.05.2025 &#8211; Pirpainti &amp; Thawe)<br>\u25cb ROB\/RUB work : 228 Nos; 6,572 Cr<br>\u25cb Running 28 Vande Bharat services (14 pairs) covering 25 districts \/ 42 unique stoppages in Bihar<br>\u25cb 26 Amrit Bharat express services (13 pairs) covering 30 district &amp; having 65 unique stoppages in Bihar<br>\u25cb Bihar is also being served by 02 Namo Bharat Rapid Rail service (01 pair service)<br>\u25cb Hon\u2019ble PM flagged off loco built at the Marhowra Plant, for export to Guinea on 20 June 2025.<br>\u25cb More than 12000 special trains planned for Chhath and Diwali<br>\u25cf Railway Projects sanctioned by Cabinet for Bihar in Hon&#8217;ble PM Modi Ji\u2019s 3rd term<br>#<br>Decisions<br>Km<br>\u20b9 Cr<br>1<br>Bikramshila and Katareah New Line<br>(District: Bhagalpur)<br>26<br>2,549<br>2<br>Narkatiaganj \u2013 Raxaul \u2013 Sitamarhi \u2013 Darbhanga &amp; Sitamarhi \u2013 Muzaffarpur Sections Doubling<br>(Districts: East Champaran, West Champaran, Sitamarhi, Darbhanga &amp; Muzaffarpur)<br>256<br>4,553<br>3<br>Aluabari Road \u2013 New Jalpaiguri 3rd and 4th line<br>(Districts: Kishanganj<br>57<br>1,786<br>4<br>Bhagalpur &#8211; Jamalpur 3rd line<br>(Districts: Munger, Bhagalpur)<br>53<br>1,156<br>5<br>Bhagalpur \u2013 Dumka \u2013 Rampurhat doubling<br>(Districts: Bhagalpur, Banka districts)<br>177<br>3,169<br>6<br>Bakhtiarpur &#8211; Rajgir &#8211; Tilaiya Doubling<br>(Districts: Patna, Nalanda, Nawada)<br>104<br>2,192<\/p>\n\n\n\n<p>Total<br>673<br>13,432<\/p>\n\n\n\n<p><\/p>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>\u25cf New railway line project from Bihta to Anugrah Narayan Road (117 Km) including Bihta ROR has been<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[5],"tags":[],"class_list":["post-1849","post","type-post","status-publish","format-standard","hentry","category-5"],"featured_image_urls":{"full":"","thumbnail":"","medium":"","medium_large":"","large":"","1536x1536":"","2048x2048":"","reviewnews-large":"","reviewnews-medium":""},"author_info":{"info":["Pramad News Papaer"]},"category_info":"<a href=\"https:\/\/pramad.in\/?cat=5\" rel=\"category\">\u0b30\u0b3e\u0b1c\u0b4d\u0b5f<\/a>","tag_info":"\u0b30\u0b3e\u0b1c\u0b4d\u0b5f","comment_count":"0","_links":{"self":[{"href":"https:\/\/pramad.in\/index.php?rest_route=\/wp\/v2\/posts\/1849","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pramad.in\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/pramad.in\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/pramad.in\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/pramad.in\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1849"}],"version-history":[{"count":1,"href":"https:\/\/pramad.in\/index.php?rest_route=\/wp\/v2\/posts\/1849\/revisions"}],"predecessor-version":[{"id":1852,"href":"https:\/\/pramad.in\/index.php?rest_route=\/wp\/v2\/posts\/1849\/revisions\/1852"}],"wp:attachment":[{"href":"https:\/\/pramad.in\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1849"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/pramad.in\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1849"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/pramad.in\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1849"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}