{"id":1575,"date":"2025-09-20T16:02:29","date_gmt":"2025-09-20T16:02:29","guid":{"rendered":"https:\/\/pramad.in\/?p=1575"},"modified":"2025-09-20T16:02:29","modified_gmt":"2025-09-20T16:02:29","slug":"historic-milestone-major-tunnel-breakthrough-achieved-in-mumbai-ahmedabad-bullet-train-projectcomfortable-ride-with-a-middle-class-fare-structure-to-ensure-accessibility-for-a-broad-section-of-societ","status":"publish","type":"post","link":"https:\/\/pramad.in\/?p=1575","title":{"rendered":"Historic Milestone: Major Tunnel breakthrough achieved in Mumbai-Ahmedabad Bullet Train ProjectComfortable ride with a middle-class fare structure to ensure accessibility for a broad section of society"},"content":{"rendered":"\n<p>Under the visionary leadership of Prime Minister Shri Narendra Modi ji, India has achieved a historic engineering milestone in the Mumbai-Ahmedabad High-Speed Rail (HSR) project.<br>A major breakthrough in the construction of a 4.8 km tunnel section was achieved today. Excavation was carried out simultaneously from the Ghansoli and Shilphata sides. The teams had advanced toward each other through challenging underwater terrain.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" src=\"https:\/\/pramad.in\/wp-content\/uploads\/2025\/09\/WhatsApp-Image-2025-09-20-at-20.29.39-1-1024x766.jpeg\" alt=\"\" class=\"wp-image-1577\"\/><\/figure>\n\n\n\n<p><br>The breakthrough moment came when the two teams successfully connected today, a remarkable engineering feat.<\/p>\n\n\n\n<p>The Railway Minister congratulated the project team, stating: &#8220;This is a landmark moment as we construct India&#8217;s first under-sea tunnel, connecting Mumbai and Thane through this challenging creek&#8221;.<\/p>\n\n\n\n<p>Multiplier effect on economy<br>The bullet train project will reduce travel time between Mumbai and Ahmedabad to just 2 hours and 7 minutes. It will connect and integrate the economies of major commercial centers.<br>The world&#8217;s first bullet train, connecting major centers like Tokyo, Nagoya, and Osaka, created a multiplier effect on Japan&#8217;s entire economy.<\/p>\n\n\n\n<p><br>Similarly, this project will unite Anand, Ahmedabad, Vadodara, Surat, Vapi, and Mumbai into a single economic corridor. It will create unified markets &amp; accelerate industrial growth along this corridor.<br>It will also facilitate knowledge transfer and economic integration. The economic gains will far exceed the initial investment through higher productivity and business expansion.<br>Union Minister mentioned that this project will meet the aspirations of middle class. This project will ensure a comfortable ride with fares structured for the middle class.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" src=\"https:\/\/pramad.in\/wp-content\/uploads\/2025\/09\/WhatsApp-Image-2025-09-20-at-20.29.39-1024x683.jpeg\" alt=\"\" class=\"wp-image-1578\"\/><\/figure>\n\n\n\n<p><br>Project Progress and Innovation<br>The Mumbai-Ahmedabad HSR project continues to demonstrate remarkable progress across multiple fronts:<br>\u25cf 320 km of viaduct (bridge) portion completed<br>\u25cf Station construction work progressing at great pace across all locations<br>\u25cf River bridges being constructed systematically<br>\u25cf Sabarmati tunnel nearing completion<\/p>\n\n\n\n<p>Sh Ashwini Vaishnaw also mentioned that every effort is being undertaken to overcome the delays caused by previous state government in Maharashtra.<br>Technical innovation<br>The project showcases cutting-edge engineering innovations that have earned international recognition. The use of single tunnel technology to accommodate two bullet trains and the deployment of 40-meter girders in viaduct construction represent significant technical achievements.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" src=\"https:\/\/pramad.in\/wp-content\/uploads\/2025\/09\/WhatsApp-Image-2025-09-20-at-20.28.41-1024x907.jpeg\" alt=\"\" class=\"wp-image-1579\"\/><\/figure>\n\n\n\n<p>Japanese partners have notably praised this technological innovation for its efficiency and design excellence.<br>India has gained substantial technological knowledge through this project. It has been continuously working closely with Japanese experts.<\/p>\n\n\n\n<p>Latest train technology and operational plans<br>Yesterday, the Union Minister met the Japanese delegation led by the Vice Minister to review the High-Speed Rail project. Both sides expressed satisfaction at the progress of the project. The first section is expected to be operational by 2027.<br>The discussions were also held on introducing the latest E10 Shinkansen (Japan&#8217;s next-generation bullet train) in India. Japan has agreed to provide India with this advanced train system.<\/p>\n\n\n\n<p>Operational Framework:<br>\u25cf Initial frequency: Every 30 minutes during the peak hour<br>\u25cf Phase 2: Every 20 minutes as operations stabilize<br>\u25cf Future expansion: Every 10 minutes to meet growing traffic demands<br>\u25cf Target opening: First section operations between Surat to Bilimora to begin in 2027<br>A comprehensive training program is also underway to ensure world-class operations. Hands-on training for loco pilots, and for maintenance staff is currently underway in J\u2026<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Under the visionary leadership of Prime Minister Shri Narendra Modi ji, India has achieved a historic engineering milestone<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[5],"tags":[],"class_list":["post-1575","post","type-post","status-publish","format-standard","hentry","category-5"],"featured_image_urls":{"full":"","thumbnail":"","medium":"","medium_large":"","large":"","1536x1536":"","2048x2048":"","reviewnews-large":"","reviewnews-medium":""},"author_info":{"info":["Pramad News Papaer"]},"category_info":"<a href=\"https:\/\/pramad.in\/?cat=5\" rel=\"category\">\u0b30\u0b3e\u0b1c\u0b4d\u0b5f<\/a>","tag_info":"\u0b30\u0b3e\u0b1c\u0b4d\u0b5f","comment_count":"0","_links":{"self":[{"href":"https:\/\/pramad.in\/index.php?rest_route=\/wp\/v2\/posts\/1575","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pramad.in\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/pramad.in\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/pramad.in\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/pramad.in\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1575"}],"version-history":[{"count":1,"href":"https:\/\/pramad.in\/index.php?rest_route=\/wp\/v2\/posts\/1575\/revisions"}],"predecessor-version":[{"id":1580,"href":"https:\/\/pramad.in\/index.php?rest_route=\/wp\/v2\/posts\/1575\/revisions\/1580"}],"wp:attachment":[{"href":"https:\/\/pramad.in\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1575"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/pramad.in\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1575"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/pramad.in\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1575"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}